Clinical laboratory consulting in all 50 states, remote and on-site Call (602) 874-1311
Menu

What is a COLA citation?

Reviewed November 26, 2026 by the Sound Lab Consultants laboratory compliance team
Short answer

A COLA citation is a written finding, issued after a COLA laboratory survey, that the lab did not meet a specific COLA accreditation criterion, which in turn maps to a CLIA regulation in 42 CFR Part 493. Each citation must be corrected with documented evidence, and serious or repeated findings can put accreditation at risk.

Regulations behind this citation

RegulationWhat it requires
42 CFR § 493.551General requirements for laboratoriesLaboratories may meet CLIA by accreditation from a CMS-approved organization such as COLA
42 CFR § 493.1773Standard: Basic inspection requirements for all laboratories issued a CLIA certificate and CLIA-exempt laboratoriesBasic inspection requirements for all laboratories
42 CFR § 493.1832Directed plan of correction and directed portion of a plan of correctionDirected plan of correction for condition-level deficiencies

Full text of the regulations

Tap a regulation to read the complete official text. Each one links to its section on eCFR.

§ 493.551 General requirements for laboratories.

(a) Applicability. CMS may deem a laboratory to meet all applicable CLIA program requirements through accreditation by a private nonprofit accreditation program (that is, grant deemed status), or may exempt from CLIA program requirements all State licensed or approved laboratories in a State that has a State licensure program established by law, if the following conditions are met:

(1) The requirements of the accreditation organization or State licensure program are equal to, or more stringent than, the CLIA condition-level requirements specified in this part, and the laboratory would meet the condition-level requirements if it were inspected against these requirements.

(2) The accreditation program or the State licensure program meets the requirements of this subpart and is approved by CMS.

(3) The laboratory authorizes the approved accreditation organization or State licensure program to release to CMS all records and information required and permits inspections as outlined in this part.

(b) Meeting CLIA requirements by accreditation. A laboratory seeking to meet CLIA requirements through accreditation by an approved accreditation organization must do the following:

(1) Obtain a certificate of accreditation as required in subpart D of this part.

(2) Pay the applicable fees as required in subpart F of this part.

(3) Meet the proficiency testing (PT) requirements in subpart H of this part.

(4) Authorize its PT organization to furnish to its accreditation organization the results of the laboratory's participation in an approved PT program for the purpose of monitoring the laboratory's PT and for making the annual PT results, along with explanatory information required to interpret the PT results, available on a reasonable basis, upon request of any person. A laboratory that refuses to authorize release of its PT results is no longer deemed to meet the condition-level requirements and is subject to a full review by CMS, in accordance with subpart Q of this part, and may be subject to the suspension or revocation of its certificate of accreditation under § 493.1840.

(5) Authorize its accreditation organization to release to CMS or a CMS agent the laboratory's PT results that constitute unsuccessful participation in an approved PT program, in accordance with the definition of “unsuccessful participation in an approved PT program,” as specified in § 493.2 of this part, when the laboratory has failed to achieve successful participation in an approved PT program.

(6) Authorize its accreditation organization to release to CMS a notification of the actions taken by the organization as a result of the unsuccessful participation in a PT program within 30 days of the initiation of the action. Based on this notification, CMS may take an adverse action against a laboratory that fails to participate successfully in an approved PT program.

(c) Withdrawal of laboratory accreditation. After an accreditation organization has withdrawn or revoked its accreditation of a laboratory, the laboratory retains its certificate of accreditation for 45 days after the laboratory receives notice of the withdrawal or revocation of the accreditation, or the effective date of any action taken by CMS, whichever is earlier.

Official text from the Electronic Code of Federal Regulations (eCFR), current as of November 24, 2026.

§ 493.1773 Standard: Basic inspection requirements for all laboratories issued a CLIA certificate and CLIA-exempt laboratories.

(a) A laboratory issued a certificate must permit CMS or a CMS agent to conduct an inspection to assess the laboratory's compliance with the requirements of this part. A CLIA-exempt laboratory and a laboratory that requests, or is issued a certificate of accreditation, must permit CMS or a CMS agent to conduct validation and complaint inspections.

(b) General requirements. As part of the inspection process, CMS or a CMS agent may require the laboratory to do the following:

(1) Test samples, including proficiency testing samples, or perform procedures.

(2) Permit interviews of all personnel concerning the laboratory's compliance with the applicable requirements of this part.

(3) Permit laboratory personnel to be observed performing all phases of the total testing process (preanalytic, analytic, and postanalytic).

(4) Permit CMS or a CMS agent access to all areas encompassed under the certificate including, but not limited to, the following:

(i) Specimen procurement and processing areas.

(ii) Storage facilities for specimens, reagents, supplies, records, and reports.

(iii) Testing and reporting areas.

(5) Provide CMS or a CMS agent with copies or exact duplicates of all records and data it requires.

(c) Accessible records and data. A laboratory must have all records and data accessible and retrievable within a reasonable time frame during the course of the inspection.

(d) Requirement to provide information and data. A laboratory must provide, upon request, all information and data needed by CMS or a CMS agent to make a determination of the laboratory's compliance with the applicable requirements of this part.

(e) Reinspection. CMS or a CMS agent may reinspect a laboratory at any time to evaluate the ability of the laboratory to provide accurate and reliable test results.

(f) Complaint inspection. CMS or a CMS agent may conduct an inspection when there are complaints alleging noncompliance with any of the requirements of this part.

(g) Failure to permit an inspection or reinspection. Failure to permit CMS or a CMS agent to conduct an inspection or reinspection results in the suspension or cancellation of the laboratory's participation in Medicare and Medicaid for payment, and suspension or limitation of, or action to revoke the laboratory's CLIA certificate, in accordance with subpart R of this part.

[63 FR 26737, May 14, 1998; 63 FR 32699, June 15, 1998]

Official text from the Electronic Code of Federal Regulations (eCFR), current as of November 24, 2026.

§ 493.1832 Directed plan of correction and directed portion of a plan of correction.

(a) Application. CMS may impose a directed plan of correction as an alternative sanction for any laboratory that has condition level deficiencies. If CMS does not impose a directed plan of correction as an alternative sanction for a laboratory that has condition level deficiencies, it at least imposes a directed portion of a plan of correction when it imposes any of the following alternative sanctions:

(1) State onsite monitoring.

(2) Civil money penalty.

(3) Suspension of all or part of Medicare payments.

(b) Procedures—(1) Directed plan of correction. When imposing this sanction, CMS—

(i) Gives the laboratory prior notice of the sanction and opportunity to respond in accordance with § 493.1810;

(ii) Directs the laboratory to take specific corrective action within specific time frames in order to achieve compliance; and

(iii) May direct the laboratory to submit the names of laboratory clients for notification purposes, as specified in paragraph (b)(3) of this section.

(2) Directed portion of a plan of correction. CMS may decide to notify clients of a sanctioned laboratory, because of the seriousness of the noncompliance (e.g., the existence of immediate jeopardy) or for other reasons. When imposing this sanction, CMS takes the following steps—

(i) Directs the laboratory to submit to CMS, the State survey agency, or other CMS agent, within 10 calendar days after the notice of the alternative sanction, a list of names and addresses of all physicians, providers, suppliers, and other clients who have used some or all of the services of the laboratory since the last certification inspection or within any other timeframe specified by CMS.

(ii) Within 30 calendar days of receipt of the information, may send to each laboratory client, via the State survey agency, a notice containing the name and address of the laboratory, the nature of the laboratory's noncompliance, and the kind and effective date of the alternative sanction.

(iii) Sends to each laboratory client, via the State survey agency, notice of the recission of an adverse action within 30 days of the rescission.

(3) Notice of imposition of a principal sanction following the imposition of an alternative sanction. If CMS imposes a principal sanction following the imposition of an alternative sanction, and for which CMS has already obtained a list of laboratory clients, CMS may use that list to notify the clients of the imposition of the principal sanction.

(c) Duration of a directed plan of correction. If CMS imposes a directed plan of correction, and on revisit it is found that the laboratory has not corrected the deficiencies within 12 months from the last day of inspection, the following rules apply:

(1) CMS cancels the laboratory's approval for Medicare payment of its services, and notifies the laboratory of CMS's intent to suspend, limit, or revoke the laboratory's CLIA certificate.

(2) The directed plan of correction continues in effect until the day suspension, limitation, or revocation of the laboratory's CLIA certificate.

Official text from the Electronic Code of Federal Regulations (eCFR), current as of November 24, 2026.

How a citation is created

COLA surveys accredited laboratories on a two-year cycle. The surveyor compares your records, procedures and staff practice against the criteria in the COLA Accreditation Manual. When the evidence for a criterion is missing, incomplete or contradicts what was observed, that criterion is cited.

Surveyors grade evidence, not intent. A lab that runs controls every day but cannot produce the signed QC review will be cited the same way as a lab that skipped the controls.

Why COLA citations matter

COLA holds deeming authority from CMS, so a COLA criterion is effectively a CLIA requirement. Citations are reviewed after the survey, and the laboratory must show corrective action before accreditation is granted or continued. Repeat citations from one survey to the next draw extra scrutiny, and COLA can require a directed plan of correction, such as bringing in an outside consultant or completing specific training.

Common citation categories

What to do the day you are cited

  1. Read each citation and write down exactly what evidence the surveyor said was missing.
  2. Stop any practice that could affect patient results right now (for example, reporting with failed QC).
  3. Find the root cause, not only the symptom.
  4. Correct it, collect proof, and assign an owner and a date.
  5. Submit a plan of correction by the deadline in your COLA post-survey report.

Frequently asked questions

Is a COLA citation the same as a CLIA deficiency?

They are closely linked. COLA criteria are written to meet or exceed CLIA, so a COLA citation usually corresponds to a CLIA regulation in 42 CFR Part 493. A CMS or state survey uses Form CMS-2567 and D-tags instead of COLA criteria.

Can a lab lose accreditation over one citation?

Usually not for a single standard-level finding that is corrected promptly. Serious, systemic or repeated findings, failure to submit acceptable corrections, or proficiency testing referral can lead to directed corrections, limits on testing or loss of accreditation.

How often does COLA survey a laboratory?

COLA surveys accredited laboratories on a two-year cycle, generally scheduled before the two-year anniversary of the last survey. Complaint or follow-up surveys can happen in between.

Can I dispute a COLA citation?

Yes. If you believe a criterion was cited in error, the laboratory director can submit records that show compliance and ask COLA to review it. Send clear evidence, such as dated records, invoices or signed documents.

Related citation guides

Cited on your last survey?

Our lab consultants write plans of correction for COLA and CMS-2567 citations and fixes the root cause so the citation doesn't come back. MyLabCompliance.io keeps competency, QC, PT, calibration and procedures survey-ready.

Book a free consultationSee MyLabCompliance.io

Or call (602) 874-1311

These guides are independent educational content from Sound Lab Consultants, based on 42 CFR Part 493 and published accreditation guidance, reviewed November 26, 2026. Not affiliated with or endorsed by COLA Inc., CMS or CDC; COLA is a registered trademark of COLA Inc. Not legal advice. Always follow your current COLA Accreditation Manual and the instructions in your survey report.