IQCP: the Individualized Quality Control Plan, explained
When you can run less external QC, and what CMS expects in the plan.
The three parts of an IQCP
- Risk assessment covering the specimen, test system, reagents, environment and testing personnel, across the pre-analytic, analytic and post-analytic phases.
- Quality control plan: the controls you will use (external, internal or built-in), how often, and what you do when they fail. It must meet at least the manufacturer's instructions.
- Quality assessment: ongoing monitoring (QC failures, complaints, corrected reports, PT results) to confirm the plan works, with the director's review.
Worked example: cartridge-based blood gas analyzer
Risks identified: clotted samples, cartridge storage temperature, operator technique. Controls: built-in electronic checks every run; liquid QC on each new lot and shipment and at the interval the risk assessment supports; temperature logs; operator competency. Quality assessment: monthly review of QC failures and error codes, quarterly director sign-off.
Track QC, temperature logs and IQCP reviews in MyLabCompliance.io, or check your QC data with the free Westgard QC calculator.
Sound Lab Consultants handles CLIA applications, state licensing, director coverage, validations and survey prep, remotely or on site. Prefer software? MyLabCompliance.io tracks QC, competency and personnel files.
Book a free consultationor call (602) 874-1311