Clinical laboratory consulting in all 50 states, remote and on-site Call (602) 874-1311
Menu
Lab startup program · Vendor-neutral · All 50 states

Lab go-live checklist: before the first patient result

Run this checklist before you report the first patient result.

Short answer: Before the first patient result, a new lab should have: the right CLIA certificate (and state license) in hand; every test verified or validated with the director's sign-off; signed procedures; QC in place for each test; proficiency testing enrollment for regulated analytes; documented training and competency; LIS reports that meet 42 CFR 493.1291 and validated interfaces; safety plans; payer enrollment for billing; and a plan for the initial survey or accreditation inspection.

Last reviewed November 26, 2026. Primary sources: eCFR, eCFR, eCFR.

Sound Lab Consultants is an independent, vendor-neutral consulting firm. We do not sell instruments or reagents and are not affiliated with any manufacturer, distributor or supplier startup program.

Lab go-live checklist: before the first patient result overview graphic from Sound Lab Consultants

Go-live checklist

AreaCheck
CertificatesCLIA certificate type covers every test; state license or permit where required; posted
ValidationVerification or validation complete and signed for each non-waived test
ProceduresProcedure manual approved, signed and dated by the director; staff trained
Quality controlQC frequency, rules and corrective action defined (42 CFR 493.1256)
Proficiency testingEnrolled for regulated analytes; alternative assessment for others (42 CFR 493.801)
PersonnelQualifications documented; training and initial competency complete
LIS and reportsReport elements, reference intervals, critical value calls, interfaces validated
SpecimensCollection, labeling, transport, rejection and referral procedures
SafetyExposure control plan, chemical hygiene plan, PPE, waste
BillingMedicare and payer enrollment, charge master, requisitions with diagnosis capture
SurveyRecords organized for the initial state agency survey or accreditation inspection

The first weeks after go-live

  • Daily review of QC, turnaround and rejected specimens.
  • Early review of the first billing cycle and denials.
  • A mock inspection before the initial survey.
  • Competency follow-up at six months.

How we help

We run the go-live review, close gaps and stay on as technical consultant or director support. Try the free CLIA self-check or see the lab startup program.

Start your lab with a plan

Book a free consultation. Tell us your test menu, location and target date, and we will lay out the licensing, validation and staffing steps in order.

Book a free consultation

Frequently asked questions

What must be done before a lab reports its first patient result?

The right CLIA certificate, verified or validated tests, approved procedures, QC, proficiency testing enrollment, and qualified, competent staff.

Does a new lab need proficiency testing before go-live?

A non-waived lab must enroll in an approved proficiency testing program for regulated analytes and use alternative performance assessment for other tests.

When is the initial CLIA survey?

For non-waived labs, after the lab begins testing under its Certificate of Registration; accredited labs are inspected by their accreditation organization. Timing depends on the agency.

Can you do a go-live review?

Yes. Book a free consultation.

Official sources

Sound Lab Consultants is an independent, vendor-neutral consulting firm. We do not sell instruments or reagents and are not affiliated with any manufacturer, distributor or supplier startup program. Sound Lab Consultants is not affiliated with or endorsed by CMS, FDA, CDC, OSHA, HHS, OIG, CAP, COLA, The Joint Commission, CLSI, any state agency, or any instrument or reagent manufacturer or distributor. Sound Lab Consultants, 25 Arizona Pl, Chandler, AZ 85225.